FLS Director immediately reports to the FCS and conducts a rapid assessment of existing conditions
| ACTION |
| Check FCS board status and other devices. |
| WHO |
|
FLS Director
|
| HOW |
| Visual check. |
| WHY |
| To identify type(s) of alarm and location within Building. |
| ACTION |
| Notify Fire Department. |
| WHO |
|
FLS Director
|
| HOW |
| Call 911. |
| WHY |
State the following information:
- 660 FIFTH AVENUE.
- Nature and extent of the Fire Emergency.
- Location within the Building.
- Number of Persons exposed/injured.
|
| ACTION |
| Activate Fire Brigade. |
| WHO |
|
FLS Director
|
| HOW |
| Hand held radio, cell phone, or telephone. |
| WHY |
| Fire Brigade will respond to Floor below the reported fire and report on conditions. |
| ACTION |
| Notify 660 FIFTH AVENUE Building Management Office at 646-948-7771. |
| WHO |
|
FLS Director
|
| HOW |
| Hand held radio, cell phone, or telephone. |
| WHY |
| Provide information as described above. |
| ACTION |
| Make contact with Floor Wardens on Fire Floor and Floor above. |
| WHO |
|
FLS Director
|
| HOW |
| PA System located at the FCS Warden Phone. |
| WHY |
| To provide and receive reports of conditions on affected Floors. |
| ACTION |
| Make a Building wide Announcement including Stairway Speakers (4W’s). |
| WHO |
|
FLS Director
|
| HOW |
| PA System located at the FCS. |
| WHY |
Provide Occupants all available information including:
- Where the fire condition exist.
- Which Floors or other parts of Building are affected.
- What action is being taken.
|
| ACTION |
| Follow procedures from Building’s Fire Safety Plan. |
| WHO |
|
FLS Director
|
| HOW |
| Be guided by procedures in F/S Plan. |
| WHY |
| F/S plan procedures have been established to limit the effects of a Fire/Smoke condition. |
| ACTION |
| Recall Elevators to lobby (if not already done). |
| WHO |
FLS Director
Lobby Security
|
| HOW |
| Recall Elevators to Lobby Level in Phase I. |
| WHY |
| Gain/Maintain control of the movement of Building Occupants. |
| ACTION |
| Immediately shut down HVAC System at the Fire Command Station. |
| WHO |
FLS Director
Building Engineers
|
| HOW |
| Perform One Point Shutdown at Fire Command Station. |
| WHY |
| Minimize air movement and prevent dissipation of smoke. |
| ACTION |
| Establish liaison with Emergency Responders |
| WHO |
FLS Director
Building Engineers
|
| HOW |
| Meet arriving First Responders at Building Lobby. |
| WHY |
- Provide information on what is known and what the Building has done so far.
- Serve as conduit for information and instructions from Emergency Personnel to Building Occupants.
|
| ACTION |
If evacuation ordered, conduct evacuation as per Fire Safety Plan.
(Do not follow evacuation procedure under Emergency Action Plan)
|
| WHO |
|
FLS Director
|
| HOW |
| Perform immediate evacuation of Fire Floor and Floor above. |
| WHY |
| The Fire Floor and Floor directly above require evacuation. |